Select Page

Two reporters with the Granite State News Collaborative took a long look at why Merrimack Station in Bow is still burning coal for electricity – the last plant in New England to do so. (Spoiler alert: Capacity auction.)

The story doesn’t cover anything that I and many other reporters haven’t covered in the past but it is an excellent roundup of the current and possibly future situation. You can read it here in NH Business Magazine.

Pin It on Pinterest