It took us a decade to build another power line to bring Quebec hydropower south into New England, but guess what: It’s currently selling power north (900MW at one point over the weekend) because a long drought in Quebec is clobbering their hydropower.
Ironic – although that’s why the line was built to send power both ways.

Return to the Concord Monitor