It took us a decade to build another power line to bring Quebec hydropower south into New England, but guess what: It’s currently selling power north (900MW at one point over the weekend) because a long drought in Quebec is clobbering their hydropower.

Ironic – although that’s why the line was built to send power both ways.

Pin It on Pinterest